Home | | Comments or Enquiries | Contact Us | Intranet | Email Login
Font size A | A | A

Hotels, Restaurants, Nightclubs & Bars



This English translation is for reference only. Should there be any discrepancy between the English translation version and the original in Chinese, the latter shall prevail.
 
  • Change of facilities

  •  

    Application procedure and documents required

    1. Completed application form for change of facilities【HS Model 105】 (forms can be downloaded from MGTO Industry Net or available from MGTO/CSRAEM/CSRAEM-I);
    • If the license owner of the establishment is a company, the relevant application form must be signed by the company's lawful representative(s) according to the signature(s) on the identity document(s), with a copy of the representative(s)' identity document(s) (front and reverse side on the same page) attached.
    • If the license owner of the establishment is an individual, he/she should sign the relevant application form according to the signature on the identity document, with a copy of the identity document (front and reverse side on same page) attached.
    • If the license owner of the establishment authorises others to make the application on his/her behalf, the original letter of authorisation with notarised signature(s), or a certified copy of such, must be submitted. Copy of the identity document(s) of the authorised person(s) must be enclosed (front and reverse side on same page).
    2. One original and four copies of the following documents must be submitted:
    a) Completed enquiry form for hotel or similar establishment (forms can be downloaded from MGTO Industry Net or available from MGTO/CSRAEM/CSRAEM-I).
    b) Floor plan, elevation and reinforcement plan in a scale of 1:100 clearly stating alterations to be made.
    c) Memorandum of description and illustration of alteration, including items differing from those stated in approved plans.
    d) Declaration of simplifying procedure【G Model 701】 (forms can be downloaded from MGTO Industry Net or available from MGTO/CSRAEM/CSRAEM-I).
    e) A copy of receipt and M6 form with its index issued by DSSOPT.
    NB:
    Design plans of all establishments must be drawn up by architects, civil engineers or technicians, in the field of electronic engineering or mechanical engineering, fire-fighting engineering companies, building contractors or construction companies, all registered with the Lands, Public Works and Transport Department (DSSOPT). All plans require signatures of applicants and relevant technicians.
    3. Original identity document of person submitting documents must be produced.

    Please note: Applicants for hotels should apply for inspection of facilities within 18 months upon notice from MGTO regarding approval of application. Applicants for similar establishments should apply for inspection of facilities within 6 months upon notice from MGTO regarding approval of application.
      Application form for inspection of facilities【HS Model 102】 can be downloaded here.

    To be submitted upon application for inspection of facilities

    1. Construction license;
    2. N1- Notification of construction completion and a copy receipt; or a copy of project legalizing approval letter and a copy of tax payment receipt;
    3. Fee for inspection of facilities - MOP 500.

    Place of Application

    Macao Government Tourism Office – Payment can be made by cash, cheque or bank draft (It should be made payable to "Direcção dos Serviços de Turismo");
    Centro de Serviços da RAEM/Centro de Serviços da RAEM das Ilhas – Payment can be made by cash, cheque or bank draft (It should be made payable to "Instituto para os Assuntos Municipais").

    Important Information

    According to Administrative Regulation no. 22/2008,
    Payment can be made by only one of the 3 means above in each payment;
    Exact amount payable should be put on the cheque and bank draft;
    The date on the cheque should be no more than 3 days prior to the date when payment is made.
    The cheque should be certified if the payment is equal to or exceeding MOP50,000.00.

    Performance pledge

    Items of Performance Pledge Standard handling time and service description
    Examination and approval of application for facility change and inform the interested party of the relevant result in the form of official letter. Within 25 working days counting from the day after MGTO receives favourable opinions from all the related technical departments.
    Inspection of facilities in relation to the application for facility change. Within 14 working days counting from the day after the interested party submits the application and provides all necessary documents to MGTO.
    Updated on: 18/03/2019
    Back